廣東綠濱墊廠家直銷,綠濱墊是如何組裝的,綠濱墊組裝需要哪幾部驟,綠濱墊的生態(tài)性,邊坡防御綠濱墊,我們擁有技術(shù)精湛的技術(shù)人員,設(shè)備精良,工廠引進(jìn)國外先進(jìn)技術(shù)與設(shè)備,擁有國內(nèi)最先進(jìn)的生產(chǎn)流水線,技術(shù)指標(biāo)達(dá)到國際同類產(chǎn)品標(biāo)準(zhǔn),是現(xiàn)代河道水利工程防護(hù)材料的專業(yè)生產(chǎn)商!您給我們第一次信任,我們回您100%滿意!
綠濱墊的安裝:
1、將綠濱墊錯(cuò)縫擺設(shè)就位,避免出現(xiàn)縱向貫通縫
2、將綠濱墊四邊立起,用綁線將相鄰邊沿鎖緊,綁鎖時(shí),將綁線圍繞兩條重合的框線(縫合邊棱時(shí)) 或框線與網(wǎng)籠的雙扭結(jié)邊(縫合格柵時(shí)) 螺旋狀扭緊,避免重鍍鋅損傷,螺距不大于50 mm
3、當(dāng)在已完成的底層網(wǎng)上面安裝綠濱墊時(shí),應(yīng)用綁線沿新裝雷諾護(hù)墊下部邊框?qū)⑵涔潭ㄔ诘讓拥睦字Z護(hù)墊上,同一層相鄰的雷諾護(hù)墊也應(yīng)用綁線相互系牢,使雷諾護(hù)墊連成一體
4、在某單元工程的同一水平層施工時(shí),應(yīng)將綠濱墊全部就位后才開始填充卵石,為了防止石籠網(wǎng)變形,相鄰兩個(gè)綠濱墊(包括同一綠濱墊墊的相鄰格室) 的填石高差不應(yīng)大于35 cm
5、綠濱墊安裝前,應(yīng)適當(dāng)修整岸坡及地面,并盡可能保持岸坡原有形狀,但不應(yīng)有明顯的隆起和凹陷
6、填充的卵石在河漫灘上選取,其抗壓強(qiáng)度應(yīng)滿足設(shè)計(jì)要求,卵石粒徑應(yīng)在8~20 cm 之間,并要求大小搭配合理以達(dá)到設(shè)計(jì)要求的空隙度和保證綠濱墊的直線外形
7、在綠濱墊內(nèi)填卵石時(shí),外露面應(yīng)用粒徑不小于10 cm 的卵石,并用人工擺砌平整,以獲得美觀的表面和防止水流將卵石從網(wǎng)目淘走。應(yīng)保證超填石料2. 5~3 cm 高,以便為沉陷留有余地
8、綠濱墊內(nèi)填滿石料后即將頂蓋蓋下,然后用綁線將兩條重合的框線螺旋狀扭緊,螺距不應(yīng)大于50 mm 。
9、在砌筑好的綠濱墊上鋪填10~15 cm的腐植土,以便植被生長(zhǎng)。
 
Salesman: ychao order hotline: 15531800576
Guangdong green shore mat factory direct sale, green mat is how to assemble, green shore pad assembly which need several step, green shore ecosystem of the mat, shore slope defense green mat, we have skilled technical personnel, well-equipped, factory introduction of foreign advanced technology and equipment, and has the most advanced production lines, technical indicators have reached international product standards, is the professional manufacturer of modern river water conservancy engineering protection material! Trust you give us the first time, we are back to you 100% satisfaction!
The installation of green shore pad:
1, will be green shore break the decoration in place, to avoid the longitudinal penetration seam
2, the green shore pad set up four edges of bag, the adjacent edge locking with cable tie, tie lock, will tie line around two overlapping box line suture (edge) or frame line and double kink of mesh edge stitching (grating) spiral twist, avoid heavy galvanized damage, pitch is not more than 50 mm
3, when at the bottom of the completed online surface when installing green shore pad, application of tie line along the lower part of new Renault pads frame should be fixed in the bottom of the Renault pads on the same layer adjacent Renault pads used cable tie fastened to each other, become an organic whole repeatedly Renault pads
4, in a unit at the same level of the engineering construction, green shore pad should be after all in place began to fill the pebble, stone cage to prevent deformation, the adjacent two green shore pad (including the same green shore mat mat of adjacent lattice room) of rock fill height difference should not be greater than 35 cm